Sale!
In Stock

BTINESFUL 12ft/20ft/32ft Long Dog Leash for 2 Dogs, No Tangle 1/3inch Reflective Dual Dog Leash Long Lead for Medium Small Dogs, Outside Long Walking Leash for Two Dogs Playing Recall Training Main rope: 12ft x 1/3″ Orange

Original price was: $78.99.Current price is: $39.50.

SKU: Q589212650311 Category:
  • Free Delivery Over $30 All Products
  • 30 days easy returns if you change your mind
  • Order before noon for same day dispatch
Guaranteed Safe Checkout

Description

BTINESFUL 12ft/20ft/32ft Long Dog Leash for 2 Dogs, No Tangle 1/3inch Reflective Dual Dog Leash Long Lead for Medium Small Dogs, Outside Long Walking Leash for Two Dogs Playing Recall Training

Product Features

  • Long leash for 2 dogs This is your first long leash for 2 dogs, both dogs can go in opposite directions without it all getting tangled. Your two dogs will be so happy when out side on it.
  • No Tangle Dual Long Leash This long double dog leash is equipped with 12ft long main rope with soft padded handle and a 3ft sling leash. 360 degree rotation buckle connect them to allow move freely and both dogs can so where they want. No more dragging.
  • Materials We used lightweight yet strong and flexible diameter 1/3inch (about 8mm) nylon rope. Reflective stitching to keep dogs safe. Two durable black clasps, can totally control a strong puppy, small, medium dogs. Soft handle to give you a premium dog walking experience.
  • Application – Perfect for Outdoor Activities with 2 dogs together. It offers the perfect balance between control, comfort and safety, so you can let your two dogs enjoy your adventures together. Walking, recall training, outdoor playing.
  • Available in black, orange, blue three colors and 12ft, 20ft and 32ft three lengths. Safe, durable, and lightweight. Great for two dogs walking playing training without tangling.
  • Warmly Remind – This is durable nylon rope rather than metal or cable leash, so please don’t use it to test the chewing ability of your dog’s teeth. Thank you!

Reviews

There are no reviews yet.

Be the first to review “BTINESFUL 12ft/20ft/32ft Long Dog Leash for 2 Dogs, No Tangle 1/3inch Reflective Dual Dog Leash Long Lead for Medium Small Dogs, Outside Long Walking Leash for Two Dogs Playing Recall Training Main rope: 12ft x 1/3″ Orange”

Your email address will not be published. Required fields are marked *